Define a Bill of Materials for a new product
Build the recipe Techondo will consume automatically on every future production run.
Before you start
- The finished product already added in Inventory › Products
- Every raw material or component it's made from, also added as products
Steps
List the components
For the finished product, open its BOM and add each raw material or sub-assembly it requires, with the quantity one unit of output consumes.
Nest sub-assemblies if you make them
If a component is itself something you produce — a sub-assembly with its own recipe — give it a BOM too. Techondo explodes the whole tree when it costs the top-level product, so you don't cost sub-assemblies by hand.
Account for expected waste
If a process typically loses a percentage to scrap, set that on the BOM. Actual scrap is still logged per run, but this gives you a realistic yield estimate before you've made anything.
Cost a hypothetical run
Before committing real materials, use the BOM to see what a batch would cost at current material prices. If it doesn't match your intuition, a quantity in the recipe is usually the reason.
What you end up with
A recipe that Techondo can consume automatically on every future run, instead of a spreadsheet someone has to remember to update.